The buildings that required assistance included Grade II Listed Buildings, Caedmon Hall and Priestley Hall. A number of defects and non-existent fire breaks were identified that required attention and due to the protected status of the buildings the university services team identified a need for a Hilti approved contractor to carry out fire stopping works to achieve compliance with fire safety standards.
Neo were required to undertake surveys in each location and then carry out the works to reinstate fire breaks around new and existing services using Hilti fire products and Hilti recommendations.
Fire stopping works on listed University buildings
Location
Leeds Beckett University Campus in Headingley
Passive Fire Protection Specialists, including Fire Door and Compartmentation Surveys, Fire Door Installation and Fire Stopping.
Neo Property Solutions Limited
Neo Court
Knowsthorpe Lane
Cross Green Industrial Estate
Leeds
LS9 0PF