Following a review of fire risk assessments in place for 19 blocks of flats, NKDC identified a risk that party walls dividing flats on the top floor were not sufficiently compartmentalised. The risk identified that in the event of a fire, smoke and flames may spread throughout the entire roof void spanning each block with potential to compromise the current stay put policy.
Throughout the construction phase representatives from the councils building control attended the site on a regular basis where through strict compliance with design proposals, a defect-free installation of passive fire protection to FIRAS certification standards was achieved.
Project Value
£700,000
Contract Term
JCT Intermediate Contract with Amendments and Contractors Design
Location
North Kesteven District Council
Property
Blocks of medium rise flats
Passive Fire Protection Specialists, including Fire Door and Compartmentation Surveys, Fire Door Installation and Fire Stopping.
Neo Property Solutions Limited
Neo Court
Knowsthorpe Lane
Cross Green Industrial Estate
Leeds
LS9 0PF